Tee

Home >> Products >> Tee

Carbon Steel Tee

Share

YARONG is a supplier of equal tee pipe fitting. World wide Exporter of carbon steel equal tee, ANSI B16.9 equal tee stockist.

Product description

Tee: There are three openings in the pipe joint called tee pipe. Its main function is to change the direction of the fluid.


Product information of Carbon Steel Tee Supplier

Produce nameCarbon Steel Tee Supplier
TYPEEqual tee, Reducing tee
Materialstainless steel, carbon steel, alloy steel
Size1/2"-100", DN15-DN2000
PressureSCH10-SCH160
SurfaceClear, Bright, Brushing
PackingSteel Pallet, Plywood, wooden Pallets
OriginMade in China, Hebei
SpeciesMore Than 300 Kinds For Choice

Carbon Steel Tee

Production of tee

Tee also known as pipe tee or tee pipe fittings, tee joints, etc. Mainly used to change the direction of the fluid, used in the main pipe to branch. It can be classified by pipe diameter. Generally, it is made of carbon steel, cast steel, alloy steel, stainless steel, copper, aluminum alloy, plastic, argon, PVC and other materials.

The tee can be divided into two types according to the process, hydraulic bulging and hot pressing.

The hydraulic bulging of tee is a forming process of expanding branch pipe by axial compensation of metal material. The process is to use a special hydraulic press to inject liquid into the tube blank with the same diameter as the tee, and extrude the tube blank through two horizontal side cylinders of the hydraulic press synchronously, the volume of the tube blank becomes smaller after extrusion, and the pressure of the liquid in the tube blank increases with the volume of the tube blank becoming smaller. When the pressure required for the expansion of the tee branch is reached, the liquid pressure in the side cylinder and the tube blank of the metal material is double. Under the heavy action, the branch pipe flows along the inner cavity of the mold and expands.

Hot press forming of tee is to flatten the tube blank larger than the tee diameter to the size of tee diameter, and open a hole at the position of drawing branch pipe; the tube blank is heated, put into the forming die, and put into the stamping die of drawing branch pipe; under the effect of pressure, the tube blank is compressed radially, in the process of radial compression, the metal flows towards the branch pipe and forms the branch pipe under the drawing of the stamping die. The whole process is formed by the radial compression of the tube blank and the drawing of the branch pipe. Different from the hydraulic expansion tee, the metal of hot pressed tee branch is compensated by the radial movement of tube blank, so it is also called radial compensation process.


Products Show


Carbon Steel Tee


More Product

Carbon Steel Tee Supplier


Company Information

1. About Yarong

A105 Flange supplier

2. Our Factory

A105 Flange supplier

3. Our Certificate

A105 Flange supplier


4. Pay And Shipment

A105 Flange supplier

FAQ

Over 10 Years of experience in pipe fittings and flange


What is your company's after service and warranty?

We make products according to drawings or standards, strictly until them reach your 100% satisfaction. We, II be unconditional replace the poor products once get the confirmation of defected products.


How to place the order?

* You send us drawing or standards.

* The sample will be sent to you once it be finished.

* After the sample be confirmed, then you place an order and pay us 30% deposit

* We start to make the product

* We take photos for your check and you then pay the balance

* We arrange shipment


Is it possible to know how the product is going on without visiting your company?

We will offer a detailed products schedule and send weekly reports with digital pictures and videos which show the machining progress.


How long can I expect to get the sample?

Samples will be ready for delivery in 7-15 days for new mold products. The samples will be sent to you via express and arrive in 3-5 days. You can use your own express account or prepay us if you do not have an account.


What about the lead time for mass production?

It depends on the order quantity and processing technology. But we always try to meet customers' requirement by adjusting our workshop schedule. Generally, the lead time is about 15-35 days

How is terms of delivery?


We accept EXW,FOB,CIF,etc.most convenient one is selectable according to your demands.


Contact Us

Alloy Cap Supplier