Stainless Steel Tee
Stainless steel tee, SS tee manufacturers, suppliers & exporters in China. Choose from our selection of stainless steel pipe fittings in a wide range of styles and sizes.
Tee: There are three openings in the pipe joint called tee pipe. Its main function is to change the direction of the fluid.
Product information of Stainless Steel Tee Supplier
Produce name | Stainless Steel Tee Supplier |
TYPE | Equal tee, Reducing tee |
Material | stainless steel, carbon steel, alloy steel |
Size | 1/2"-100", DN15-DN2000 |
Pressure | SCH10-SCH160 |
Surface | Clear, Bright, Brushing |
Packing | Steel Pallet, Plywood, wooden Pallets |
Origin | Made in China, Hebei |
Species | More Than 300 Kinds For Choice |
Production of tee
Tee also known as pipe tee or tee pipe fittings, tee joints, etc. Mainly used to change the direction of the fluid, used in the main pipe to branch. It can be classified by pipe diameter. Generally, it is made of carbon steel, cast steel, alloy steel, stainless steel, copper, aluminum alloy, plastic, argon, PVC and other materials.
The tee can be divided into two types according to the process, hydraulic bulging and hot pressing.
The hydraulic bulging of tee is a forming process of expanding branch pipe by axial compensation of metal material. The process is to use a special hydraulic press to inject liquid into the tube blank with the same diameter as the tee, and extrude the tube blank through two horizontal side cylinders of the hydraulic press synchronously, the volume of the tube blank becomes smaller after extrusion, and the pressure of the liquid in the tube blank increases with the volume of the tube blank becoming smaller. When the pressure required for the expansion of the tee branch is reached, the liquid pressure in the side cylinder and the tube blank of the metal material is double. Under the heavy action, the branch pipe flows along the inner cavity of the mold and expands.
Hot press forming of tee is to flatten the tube blank larger than the tee diameter to the size of tee diameter, and open a hole at the position of drawing branch pipe; the tube blank is heated, put into the forming die, and put into the stamping die of drawing branch pipe; under the effect of pressure, the tube blank is compressed radially, in the process of radial compression, the metal flows towards the branch pipe and forms the branch pipe under the drawing of the stamping die. The whole process is formed by the radial compression of the tube blank and the drawing of the branch pipe. Different from the hydraulic expansion tee, the metal of hot pressed tee branch is compensated by the radial movement of tube blank, so it is also called radial compensation process.
Products Show
More Product
Company Information
1. About Yarong
2. Our Factory
3. Our Certificate
4. Pay And Shipment
FAQ
Over 10 Years of experience in pipe fittings and flange
What is your company's after service and warranty?
We make products according to drawings or standards, strictly until them reach your 100% satisfaction. We, II be unconditional replace the poor products once get the confirmation of defected products.
How to place the order?
* You send us drawing or standards.
* The sample will be sent to you once it be finished.
* After the sample be confirmed, then you place an order and pay us 30% deposit
* We start to make the product
* We take photos for your check and you then pay the balance
* We arrange shipment
Is it possible to know how the product is going on without visiting your company?
We will offer a detailed products schedule and send weekly reports with digital pictures and videos which show the machining progress.
How long can I expect to get the sample?
Samples will be ready for delivery in 7-15 days for new mold products. The samples will be sent to you via express and arrive in 3-5 days. You can use your own express account or prepay us if you do not have an account.
What about the lead time for mass production?
It depends on the order quantity and processing technology. But we always try to meet customers' requirement by adjusting our workshop schedule. Generally, the lead time is about 15-35 days
How is terms of delivery?
We accept EXW,FOB,CIF,etc.most convenient one is selectable according to your demands.
Contact Us